Quality you can read off the docket

ISO 9001:2015 certified quality management, mixes designed and tested to IS codes, and an in-house laboratory that checks raw materials and every delivery.

Press a cube

Every delivery is sampled

Cubes are cured and crushed at 7 and 28 days and the result is read against the specified grade.

Specified grade

A demonstration of how a 28-day cube result is read against the specified strength under IS 456. Results shown are illustrative; project records are issued per pour.

28-day result
fck specified
30 MPa
Cube result
– MPa
Margin
–
Acceptance
≥ fck − 3
Load the cube

IS 456 individual-sample criterion shown. Mean-of-four and standard-deviation checks also apply to a lot.

Controls

Automated batching, manual vigilance

Computerised batching

Every ingredient weighed on load cells against the approved mix design, with batch records kept.

Raw material testing

Aggregate grading and moisture, cement and water checked in-house before use.

Fresh concrete tests

Slump and temperature at the plant and at site, before the pour starts.

Cube testing

Cubes cast per sampling plan, cured and crushed at 7 and 28 days; results reported to the client.

Delivery documentation

Each load leaves with a docket: grade, quantity, batch time and the truck.

Cement silos, the mixer tower and the covered conveyor from the aggregate batcher: every ingredient is weighed here before mixing
Cement silos, the mixer tower and the covered conveyor from the aggregate batcher: every ingredient is weighed here before mixing
Weigh batching · Gaulane
Slump classes we batch to

Measured with the standard cone at the plant and again at site

Bands follow IS 456.

Slump class

Low 25–75 mm

Mass concrete, lightly reinforced sections, pavements

Slump class

Medium 50–100 mm

Normally reinforced slabs, beams, walls, columns

Slump class

High 100–150 mm

Pumped concrete, congested reinforcement

Slump class

Flowing Flow test

Self-compacting concrete, placed without vibration

Indian Standards for ready-mixed concrete

The codes behind every mix

StandardTitleWhat it governs here
IS 456:2000Plain and reinforced concrete: code of practiceGrades, durability, cover, acceptance criteria
IS 4926:2003Ready-mixed concrete: code of practiceProduction, delivery and documentation of RMC
IS 10262:2019Concrete mix proportioningMix design method for every grade we supply
IS 383:2016Coarse and fine aggregatesGrading, deleterious materials, moisture
IS 269:2015 / IS 1489 / IS 455Cements: OPC, PPC, PSCCement types accepted at the silo
IS 9103:1999Concrete admixturesPlasticisers and superplasticisers
IS 1199Fresh concrete: sampling and testingSlump, flow, temperature, sampling plan
IS 516Hardened concrete: strength testsCube strength at 7 and 28 days

Need the test records for a pour?

Cube results, batch reports and dockets are issued per delivery. Ask for them with your order.